Infrastructure3
Labor, Materials, and Infrastructure
plan
Master Plan
Nothing here yet.
Define your project scope →inventory
Loading your inventory…
Master Regulatory Mapping
Global / Multilateral
EPD / LCA
IN EFFECTEnvironmental Product Declarations (EPD) / Life Cycle Assessment (LCA)
EPD / LCA
IN EFFECTType III declarations from Life Cycle Assessment data under ISO 14025 / EN 15804.
IFC Performance Standard 2
IN EFFECTNOT SCOREDLabor and Working Conditions
IFC Performance Standard 2
IN EFFECTNOT SCOREDIFC PS2 (revised 2012) applies to all IFC-financed projects. Requires: signed employment agreements, wage records, grievance mechanisms, non-discrimination policies, and OHS management systems. Subcontractor compliance is the primary client's responsibility. Violation can trigger suspension of disbursements and mandatory remediation.
ILO C131 (1970)
IN EFFECTNOT SCOREDMinimum Wage Fixing Convention
ILO C131 (1970)
IN EFFECTNOT SCOREDILO Convention 131 requires member states to establish wage-fixing machinery covering all employed groups. For construction: signed daily wage records must capture actual wages paid vs. the applicable minimum. Directly linked to anti-exploitation requirements in development bank environmental and social frameworks.
ILO C167 (1988)
IN EFFECTNOT SCOREDSafety and Health in Construction Convention
ILO C167 (1988)
IN EFFECTNOT SCOREDILO Convention 167 sets minimum safety and health requirements for all temporary and permanent construction sites: site preparation, machinery, PPE, fall prevention, excavation, scaffolding, and accident reporting. Ratified by 35 member states; referenced as the baseline by development banks (World Bank, AfDB, ADB) in project compliance requirements.
ILO C29 / C105
IN EFFECTNOT SCOREDForced Labour Conventions
ILO C29 / C105
IN EFFECTNOT SCOREDILO Conventions 29 (1930) and 105 (1957) eliminate all forms of forced or compulsory labour. Construction is a high-risk sector — particularly for migrant workers, bonded labour, and debt bondage. All 187 ILO member states have ratified C29 (near-universal). Funder ESF requirements specifically require signed evidence of freely-contracted labour.
ISO 14040:2006
IN EFFECTNOT SCOREDEnvironmental Management — Life Cycle Assessment — Principles and Framework
ISO 14040:2006
IN EFFECTNOT SCOREDISO 14040:2006 describes the principles and framework for life cycle assessment (LCA): definition of the goal and scope, the life cycle inventory analysis (LCI) phase, the life cycle impact assessment (LCIA) phase, the life cycle interpretation phase, reporting and critical review, limitations, the relationship between the LCA phases, and conditions for use of value choices and optional elements. It covers LCA and LCI studies. It does NOT describe the LCA technique in detail and does NOT specify methodologies for the individual phases — a study claiming a method on 14040's authority is claiming something 14040 declines to give. Edition 2, published 2006-07, 20 pages, ISO/TC 207/SC 5, ICS 13.020.10 / 13.020.60. Stage 90.93 — confirmed on review in 2022, so this version remains current. One amendment: ISO 14040:2006/Amd 1:2020.
ISO 14044:2006
IN EFFECTNOT SCOREDEnvironmental Management — Life Cycle Assessment — Requirements and Guidelines
ISO 14044:2006
IN EFFECTNOT SCOREDISO 14044:2006 specifies requirements and provides guidelines for life cycle assessment: definition of goal and scope, the life cycle inventory analysis (LCI) phase, the life cycle impact assessment (LCIA) phase, the life cycle interpretation phase, reporting and critical review, limitations, the relationship between the LCA phases, and conditions for use of value choices and optional elements. It covers LCA and LCI studies. This is the requirements half of the pair — 14040 states the framework, 14044 states what a study must actually do to conform. Edition 1, published 2006-07, 46 pages, ISO/TC 207/SC 5, ICS 13.020.10 / 13.020.60. Stage 90.93 — confirmed on review in 2022, so this version remains current. Two amendments: Amd 1:2017 and Amd 2:2020.
ISO 14067:2018
IN EFFECTNOT SCOREDGreenhouse Gases — Carbon Footprint of Products — Requirements and Guidelines for Quantification
ISO 14067:2018
IN EFFECTNOT SCOREDISO 14067:2018 specifies principles, requirements and guidelines for quantifying and reporting the carbon footprint of a product (CFP), consistent with ISO 14040 and ISO 14044. Requirements for a PARTIAL CFP are also specified. It addresses only a single impact category: climate change. Carbon offsetting and the communication of CFP information are explicitly OUTSIDE its scope — a standard that quantifies a number is not a standard that licenses a label built on it. It assesses no social or economic aspect and no other environmental impact. Edition 1, published 2018-08, 46 pages, ISO/TC 207/SC 7, ICS 13.020.40. Supersedes the withdrawn ISO/TS 14067:2013.
LEED v4.1 (USGBC)
IN EFFECTNOT SCOREDLeadership in Energy and Environmental Design
LEED v4.1 (USGBC)
IN EFFECTNOT SCOREDUSGBC LEED v4.1 is the world's most widely adopted green building rating system, active in 185 countries. Certification requires documented evidence across: site selection and ecology, water efficiency, energy and atmosphere (including on-site renewables), materials and resources (recycled content, regional materials, construction waste diversion), indoor environmental quality, and innovation credits. LEED for Neighborhood Development (LEED ND) specifically covers community-scale projects — food markets, mixed-use centres, public plazas, and community energy installations. Increasingly required as a condition of funding by World Bank, IFC, USAID, EU structural funds, and green bond issuers for any new public building.
UNCAC (UN General Assembly A/58/422)
IN EFFECTNOT SCOREDUN Convention Against Corruption
UNCAC (UN General Assembly A/58/422)
IN EFFECTNOT SCOREDUN Convention Against Corruption (2003) — ratified by 190 states. Requires transparent public procurement, auditable project records, beneficial ownership disclosure, and anti-bribery controls for all public works. Development banks (World Bank, IMF, AfDB) use UNCAC compliance as a precondition for infrastructure lending. Sanctions for proven diversion of project funds include blacklisting from future lending.
United States / California
CA SB 253
IN EFFECTClimate Corporate Data Accountability
CA SB 253
IN EFFECTMandatory Scope 3 primary GHG data disclosure.
CA SB 261
IN EFFECTNOT SCOREDClimate-Related Financial Risk
CA SB 261
IN EFFECTNOT SCOREDEvidence of physical and transition risk resilience.
IRA § 48E (P.L. 117-169)
IN EFFECTNOT SCOREDClean Electricity Investment Tax Credit
IRA § 48E (P.L. 117-169)
IN EFFECTNOT SCOREDInflation Reduction Act § 48E provides a 30% investment tax credit for qualifying clean electricity facilities including solar PV. Full credit requires: prevailing wage compliance for construction workers, apprenticeship hour requirements (12.5% of total labor hours), and domestic content bonus (additional 10% for US-manufactured components). Credit value: 6% base + bonuses up to 50% for energy communities and low-income projects.
OSHA 29 CFR Part 1926
IN EFFECTNOT SCOREDConstruction Safety and Health Standards
OSHA 29 CFR Part 1926
IN EFFECTNOT SCOREDUS federal construction safety standards covering: excavation, scaffolding, fall protection, cranes and derricks, electrical, fire protection, and personal protective equipment. Employers must maintain injury and illness records (OSHA 300 log). CalOSHA imposes California-specific addenda with stricter requirements. Penalty per willful violation: up to $156,259.
European Union
Regulation (EU) 2026/1030
IN EFFECTCountEmissionsEU — GHG Accounting of Transport Services
Regulation (EU) 2026/1030
IN EFFECTEU-wide methodology for calculating greenhouse gas emissions of freight and passenger transport services, in force 1 June 2026. Aligned with EN ISO 14083:2023. Applies to companies that voluntarily disclose transport emissions: once emissions are disclosed, the calculation must follow this methodology.
Directive 92/57/EEC
IN EFFECTNOT SCOREDTemporary and Mobile Construction Sites
Directive 92/57/EEC
IN EFFECTNOT SCOREDEU Directive 92/57/EEC and implementing Directives 89/391/EEC (OSH Framework) require: pre-construction safety plans, appointment of a safety coordinator, advance notification to national authorities for sites >30 working days or >500 person-days, mandatory health and safety file handed over at project completion. Applies to all construction work in EU member states.
Decision 2022/2481/EU
IN EFFECTNOT SCOREDEU Digital Decade Policy Programme 2030
Decision 2022/2481/EU
IN EFFECTNOT SCOREDEU Digital Decade Policy Programme sets legally binding targets for 2030: gigabit connectivity for all EU households, 5G coverage for all populated areas, and deployment of 10,000 climate-neutral edge nodes. Connectivity infrastructure projects funded through CEF Digital or structural funds must demonstrate progress toward these targets via annual monitoring reports submitted to the Commission.
India
BOCW Act, 1996
IN EFFECTNOT SCOREDBuilding and Other Construction Workers Act
BOCW Act, 1996
IN EFFECTNOT SCOREDThe Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act 1996 mandates: registration of every construction establishment employing 10 or more workers; welfare fund contributions (1% of construction cost) to state BOCW boards; health and safety measures; hours of work; overtime; and accident compensation. The BOCW Welfare Cess Act 1996 imposes a cess on construction cost.
BRSR Core
IN EFFECTVCP ESG KPIs
BRSR Core
IN EFFECT9 mandatory ESG KPIs for value chain partners.
TRAI Act 1997 + Broadband Policy
IN EFFECTNOT SCOREDTelecom Regulatory Authority of India — Digital Connectivity
TRAI Act 1997 + Broadband Policy
IN EFFECTNOT SCOREDTRAI's National Broadband Mission (2019) and associated Quality of Service regulations govern public WiFi (PM-WANI scheme), broadband infrastructure deployment, and service level benchmarks. PM-WANI authorises App Providers, Aggregator Providers, and PDO operators to deploy public WiFi hotspots without license for the first year. Service quality and coverage metrics are reported to TRAI quarterly.
United Kingdom
CDM 2015 (SI 2015/51)
IN EFFECTNOT SCOREDConstruction Design and Management Regulations 2015
CDM 2015 (SI 2015/51)
IN EFFECTNOT SCOREDUK CDM Regulations require: pre-construction notification to the HSE for projects lasting >30 days with >20 simultaneous workers, or >500 person-days; appointment of a principal designer and principal contractor; construction phase plan; and a health and safety file at handover. The CDM Regulations are retained UK law post-Brexit (derived from EU Directive 92/57/EEC but with UK-specific enforcement under HSE).
Australia
WHS Act 2011 (Cth) + State Acts
IN EFFECTNOT SCOREDWork Health and Safety Act
WHS Act 2011 (Cth) + State Acts
IN EFFECTNOT SCOREDCommonwealth Work Health and Safety Act 2011, harmonized across all Australian states and territories except Victoria and Western Australia (which have equivalent Acts). Requires: safe work method statements (SWMS) for high-risk construction work, site inductions, fall prevention plans, and incident notification to the relevant WHS regulator. Principal contractors must ensure subcontractor compliance.
West Africa
COREN (D.N. Cap C16)
IN EFFECTNOT SCOREDCouncil for Regulation of Engineering in Nigeria
COREN (D.N. Cap C16)
IN EFFECTNOT SCOREDCouncil for the Regulation of Engineering in Nigeria (COREN) — established by Decree No. 55 (1970), now Cap C16 Laws of the Federation 2004. All engineering projects in Nigeria must be supervised by a COREN-registered engineer. Project registration, design drawings, and progress reports must be filed with COREN. Applies to civil, structural, electrical, and mechanical works including solar installations and digital infrastructure.
NCC Act 2003 + Type Approval
IN EFFECTNOT SCOREDNigerian Communications Commission — Digital Services
NCC Act 2003 + Type Approval
IN EFFECTNOT SCOREDNigerian Communications Commission Act 2003 and associated Type Approval Regulations govern all telecommunications and internet service provision in Nigeria. Community WiFi, mesh networks, and public hotspot operators require an Internet Service Provider (ISP) license or operate under a licensed aggregator. Equipment must carry NCC type approval. Quality of service regulations require uptime and bandwidth records.
SON MANCAP
IN EFFECTNOT SCOREDQuality Standardization
SON MANCAP
IN EFFECTNOT SCOREDQuality standardization and written care labels.